Gable Ends

Work this week has been focused on the north and south gable ends.


With the increasing height of the ends the complexion of the house has changed.


Just one more foot of height to go and then the ridge beam will be set.


The loft window has been installed and a hole has been left in the wall for the stove pipe.


The loft will have some niches in the walls.


Glass block has been installed in the south end.


So tall!



I can't wait for the roof to be installed. It won't be long now.